Current position:HOME > News > Industry Dynamic

          Yuba manufacturers hand to teach you Yuba installation process

          Editor:Switch socket _ switch socket to join the agent _ switch socket top ten brands _ Yuba manufacturers wholesale _ Zhejiang GELAN E │ Release Time:2019-01-22 

          Yuba is a must-have household appliance for winter bathing. Many people know how to use it, but they don't know how to install it. Today, Yuba manufacturers will teach you the installation process of Yuba.

          浴霸安裝流程

          1, open the vent


          Determine the position of the ventilation holes on the wall, which should be slightly lower than the air outlet of the centrifugal fan casing above the ceiling to prevent the dew condensation water from flowing into the appliance and open a round hole at this position.


          2, ceiling preparation


          Note that the vacancy is left at the installation position according to the size of the opening, and the height of the sandwich space formed between the ceiling and the top of the house shall not be less than 220 mm.


          3, fixed Yuba


          Remove the cover, unscrew all the bulbs, disengage the spring from the ring of the mask and remove the cover.


          4, wiring


          One end of the interactive cord is connected to the switch panel, and the other end is pulled out from the ceiling opening together with the power cord. Open the terminal cover on the cabinet and connect the cable according to the wiring diagram and the terminal mark. Terminal block cover, screw the terminal block cover.


          5, connect the ventilation pipe


          Pull out the end of the air duct into the room and pull it out on the air outlet of the centrifugal fan casing.


          6. Push the box into the hole


          According to the position of the air outlet, select the correct direction to insert the Yuba cabinet into the hole. Use 4 wooden screws with a diameter of 4mm and a length of 20mm to fix the box on the ceiling wood.


          7, the installation mask


          Insert the mask positioning foot and the positioning groove of the box, and insert the spring on the corresponding loop of the mask.


          8, install the bulb


          Carefully screw all the bulbs into good electrical contact with the lamp holder, then wipe the bulb and mask clean.


          9, fixed switch


          Secure the switch to the wall to prevent the power cord from being pulled when in use.


          The above points are the installation steps of the Yuba, whether it is the lamp warm bath or the air heater, for the Yuba to play the biggest role, then understanding these installation related knowledge is a must.

          CONTACT

          Fax:0086-573-83250880 Service Hotline:0086-573-83250886 83250887 Free Service Hotline:400-008-7727 E-mail:gelancn@126.com Address:No. 459, Qingyuan Road, Wangdian Town, Jiaxing City, Zhejiang Province
          Follow us

          Zhejiang GeLan Electric Co., Ltd.

          在線咨詢

          聯系電話

          400-008-7727

          亚洲一区二区三区欧美中文_国产精品高清国产三级国产av_亚洲天堂性爱精品无码_亚洲综合av 一区

          
          

                  欧美伊香蕉久久综合网另类 | 在线观看免费日本 | 亚洲精品国产第一综合 | 一区二区精品视频日本 | 亚洲性爱在线网站 | 丝袜足午夜福利视频丝袜 |